
Meta claims $3.9B research tax credit on AI data centers
Meta saved $3.9 billion in 2025 by calling AI data centers research 'pilot models' under a 1981 tax credit, the New York Times reports.
Tag archive

Meta saved $3.9 billion in 2025 by calling AI data centers research 'pilot models' under a 1981 tax credit, the New York Times reports.

Technology leaders are looking toward the stars to solve the massive energy demands of modern...

DRAM contract prices rise 13-18% in Q3 2026 after an 80-90% jump in Q1, as memory makers move capacity to AI servers.

Why the Data Center Debate Matters The disruption of a Climate Week panel by Extinction...
Oracle’s planned 2.45-GW New Mexico campus faces power and permitting uncertainty, while New Jersey fined DataOne $1.07 million for operating 62 unpermitted natural-gas generators at an AI-oriented facility.

As engineering teams scale Large Language Model (LLM) training and real-time inference clusters,...
An accelerator can be allocated before the power to run it exists. That is the constraint shaping...
The rack crossed a boundary. With A100 and H100, NVIDIA delivered an integrated eight-GPU server....

Server CPU lead times have gone from two weeks to about six months, and AI systems now need more CPUs per rack, not fewer.

Fujitsu's 144-core MONAKA goes on sale in November, with 2nm cores stacked over 5nm cache and GCC 15 support already upstream.

The Concept Behind “Adopt a Data Center” Basura, a New York‑based creative studio founded...

The Money Trail: Who’s Funding the South Dakota Race and Why In the final stretch before...